RecreativeDekHockey St-Eustache (phase 3)
Location
St-Eustache
Type of mandate
Extension
Status
In construction
Date in construction
August 2024 – January 2025
Area
24 000 pi2 (2 230 m2)
Floors
1 + mezzanine
Architect
Jean-François Dupuis
More details
Phase 3 includes two new playing fields and an enlarged parking lot that will add 114 spaces in front of and to the side of the building.
Learn more about the project
High densityIn Via (Phase 1)
Location
Mirabel
Type of mandate
New building
Status
In construction
Date in construction
August 2024 – June 2025
Area
9 800 sq. ft. (910 m2)
Floors
4
Architect
Coursol – Miron Architects
Learn more about the project
High densityPlace Liria Blainville (Phase 1)
Location
Blainville
Type of mandate
New building
Status
In construction
Date in construction
September 2024 – July 2026
Area
Place Liria Blainville is a mixed-use living space of more than 1 million sq. ft. feet
Floors
15 floors (on the ground) + 3 floors (underground parking)
Architect
NEUF Architectes
More details
Phase 1 will feature a 15-story residential tower with a total of 137 rental apartments, including 48 1-bedroom units, 48 2-bedroom units, 24 3-bedroom units, 12 penthouse units and 5 townhouses. The new building will also offer tenants an indoor swimming pool, a gym, collaborative spaces, as well as an indoor parking lot spread over three underground levels.
Learn more about the project